August / 2020
- Lake Nona Golf & Country Club in Orlando, Florida saw the completion of a new 18 hole irrigation system. The Rainbird IC system designed by A.S. Altum and Associates is comprised of over 3,000 sprinklers on HDPE pipe. The system took 7 months to complete.
June / 2020
Big Foot Country Club in Fontana, Wisconsin witnessed the completion of new 18 hole irrigation system. The Toro 2-wire decoder system designed by Michael Kuhn & Associates is comprised of just over 1,400 sprinklers on HDPE pipe. The project took 10 months complete after a 3 month hiatus for inclement weather.
May / 2020
The Hawthorns Golf & Country Club completed a bunker renovation project. All of the greenside bunkers were reconstructed which included the installation of additional drainage. The project took 2 months to complete.
February / 2020
Leibold Irrigation completed a satellite replacement project at Wailea Golf Club in Wailea, Hawaii. The control system was upgraded by installing 76 new Rainbird satellites. The project took 3 weeks to complete.
January / 2020
Leibold Irrigation completed the installation of a new 9 hole irrigation system at The Oaks Country Club in Greenville, Texas. The Toro 2-wire decoder system designed by E.C. Design is comprised of 350 sprinklers on HDPE pipe. The system took 2 months to complete.
November / 2019
Leibold Irrigation construction teams completed renovation projects at 2 golf courses in November.
- Ruth Lake Country Club in Hinsdale, Illinois underwent a renovation to it's driving range tee and short game area. Additional drainage was installed throughout the property and numerous bunkers where also reconstructed. The project took 4 months to complete.
- Minocqua Country Club in Minocqua, Wisconsin completed a bunker renovation project. All of the greenside bunkers were reconstructed which included the installation of new bunker drainage. The project took just over 2 months to complete.
August / 2019
- Sunset Ridge Country Club in Northfield, Illinois witnessed the completion of a new 18 hole Rainbird irrigation system. The E.C. Design system is comprised of nearly 2,000 sprinklers on HDPE pipe and controlled via Rainbird's IC 2-wire control system. The project took 10 months to complete after a 4 month hiatus for inclement weather.
- Leibold Irrigation completed the installation of a new 18 hole Toro irrigation system at Seminole Lake Country club in Seminole, Florida. Leibold Irrigation collaborated with WescoTurf to design the system which is comprised of over 500 sprinklers and controlled via Toro's 2-wire decoder control system. The project took 3 months to complete.
- The Rookery in Marco Island, Florida now operates it's irrigation system via Toro's 2-wire decoder system. Leibold Irrigation was tasked with replacing all the existing sprinklers with new Toro Infinity sprinklers and installing 2-wire decoder wire to control the system. The Ragan Technical Solutions design took 3 months to complete.
July / 2019
With a brutally long and harsh winter followed up by an extremely rain-soaked spring, numerous projects in the upper Midwest experienced first hand the wrath of Mother Nature.
- Leibold irrigation and construction crews partnered to complete a full course renovation project at Tuckaway Country Club in Franklin, Wisconsin. The construction team was tasked with the renovating and construction of numerous tees and bunkers while also upgrading the existing drainage throughout the golf course. Leibold Irrigation also installed a completely new 18 hole Toro irrigation system designed by E.C. Design Group. The system comprised of over 1,400 sprinklers on HDPE pipe is operated with Toro VP satellites and Lynx software. The project took 11 months to complete after a 4 month hiatus for inclement weather.
- Briarwood Country Club in Deerfield, Illinois witnessed the completion of a new 18 hole Rainbird irrigation system. The Michael Kuhn & Associates designed system is comprised of over 1,500 sprinklers on HDPE pipe and controlled via Rainbird's IC 2-wire control system. The project took 11 months to complete after a 4 month hiatus for inclement weather.
- Leibold Irrigation completed the installation of a new 18 hole Rainbird irrigation system at the Glen View Club in Golf, Illinois. The Michael Kuhn & Associates designed system is comprised of over 1,400 sprinklers and controlled via Rainbird's IC 2-wire control system. The project took 11 months to complete after a 4 month hiatus for inclement weather.
- Lake Forest Country Club in Hudson, Ohio saw the installation of a new 18 hole Toro irrigation system draw to a close. The Michael Kuhn & Associates designed system is comprised of over 1,100 sprinklers and operated via Toro's 2-wire decoder system. The project took 11 months to complete after numerous work stopages for inclement weather.
June / 2019
Leibold Irrigation completed the installation of new 18 hole Toro irrigation system at Oak Ridge Country Club in Hopkins, Minnesota. The new system designed by E.C. Design Group is comprised of 1,100 sprinklers on HPDE pipe and controlled via Toro's 2-wire decoder system. The project took 10 months to complete after a 4 month hiatus for winter weather.
May / 2019
- Leibold Irrigation completed the installation of a new 18 hole irrigation system at Quincy Country Club in Quincy, Illinois. The Toro 2-wire decoder system designed by A.S. Altum and Associates is comprised of nearly 1,000 sprinklers on HDPE pipe. The new system took just over 4 months to install.
- Greenbriar Hills Country Club in Kirkwood, Missouri witnessed the completion of a new 18 hole irrigation system. The Toro system designed by E.C. Design Group is comprised of just over 1,300 sprinklers on HDPE pipe and took 7 months to complete.
March / 2019
Leibold Irrigation completed a renovation of the East Course at the Country Club of Birmingham in Mountain Brook, Alabama. Irrigation and construction crews teamed up to complete the 9 month project which included a new 18 hole irrigation system and the renovation of many of the golf course features. The driving range and short game area were completely renovated along with the construction of numerous new tees to make the course more playable for all skill levels. The new Toro irrigation system designed by James Barrett is comprised of over 1,400 sprinklers and operated via Toro Lynx Smart Satellite system.
November / 2018
Bay Hill Club and Lodge in Orlando, Florida witnessed the completion of a new Rainbird irrigation system on the Championship Course. The new system, designed by A.S. Altum and Associates is comprised of over 3,600 sprinklers on HDPE pipe and controlled with Rainbird's IC 2-wire control system. While on site, Leibold crews also installed irrigation for a newly constructed short game area, and replaced the existing satellite control system on the 9 hole Charger Course. The entire project took just over 7 months to complete.
October / 2018
- Leibold Irrigation completed the installation of a new 18 hole irrigation system at Stoneybrook Golf & Country Club in Sarasota, Florida. The A.S. Altum and Associates design is comprised of over 1,500 Rainbird sprinklers installed on HDPE pipe and controlled via Rainbird's IC 2-wire control system. The project took just over 7 months to complete.
- Palm Aire Country Club in Sarasota, Florida witnessed the completion of a new 18 hole irrigation system. The A.S. Altum and Associates design is comprised of over 1,200 Toro sprinklers on HDPE lateral pipe and PVC mainlines. The system is controlled with Toro OSMAC G3 satellites, and took 5 months to complete.
- Installation of a new Toro 2-wire decoder system at Westfield Country Club in Westfield Center, Ohio was completed on the venue's South Course. The Michael Kuhn & Associates designed system is comprised of over 1,500 sprinklers on HDPE lateral pipe and PVC mainlines.
September / 2018
- Merion Golf Club in Ardmore, Pennsylvania completed a full course renovation of the East Course. Leibold Irrigation was tasked with installing a new 18 hole irrigation system designed by Paul Roche of Golf Water, LLC. The IC 2-wire Rainbird system is hydraulically supplied by PVC mainlines, while the nearly 2,100 sprinklers are installed on HDPE lateral piping. The irrigation installation took just over 8 months to complete.
- West Bay Club in Estero, Florida witnessed it's full course renovation project draw to a close. Leibold crews were tasked with replacing portions of the irrigation system affected by the construction project, while also completely replacing the irrigation on holes that were entirely reconstructed. The Toro satellite system took 7 months to complete.
May / 2018
Leibold Irrigation crews finished three major projects in the month of May.
- Installation of a new 18 hole irrigation system was completed at Myopia Hunt Club in South Hamilton, Massachusetts. The new Rainbird system consisted of over 2,500 sprinklers on HDPE pipe, and is operated via Rainbird's IC 2-wire control system. Aqua Agronomic Solutions, Inc. supplied the design for the system which took roughly 10 months to complete after a short break for inclement weather.
- The second and final phase of a 27 hole renovation project was finished at Old Oakland Golf Club in Indianapolis, Indiana. Leibold crews installed over 1,200 new Toro sprinklers throughout the span of the 2 year project. The A.S. Altum and Associates designed system is controlled with Toro Lynx Smart satellites.
- Park Ridge Country Club in Park Ridge, Illinois witnessed the completion of a new 18 hole irrigation system. The Rainbird system designed by E.C. Design Group consisted of just over 1,700 sprinklers on HDPE pipe, and is controlled via Rainbird's IC 2-wire control system. The project took 10 months to complete after a 3 month hiatus for winter weather.
April / 2018
Leibold Irrigation completed two major irrigation projects in the month of April.
- Atlantic Golf Club in Bridgehampton, New York saw the installation of a new 18 hole irrigation system draw to a close. The Aqua Agronomic Solutions, Inc. design consisted of over 2,500 Rainbird sprinklers on HDPE pipe and is operated via Rainbird's IC 2-wire control system. The project took just over 7 months to complete.
- Stone Oak Country Club in Holland, Ohio also witnessed the completion of their new 18 hole irrigation system. The A.S. Altum and Associates Toro design consisted of over 1,100 sprinklers on HDPE pipe and is operated via Toro's 2-wire decoder system. The project took 6 months to complete after a brief hiatus for winter weather.
November / 2017
Leibold Irrigation finished installing a new 18 hole irrigation system at Kenosha Country Club in Kenosha, Wisconsin. The Toro system designed by T.J. Emmerich Associates is comprised of over 1,000 sprinklers controlled via Toro's 2-wire decoder system. The installation took 5 months to complete.
September / 2017
- Shinnecock Hills Golf Club in Southampton, New York, underwent modifications to it's irrigation system in preparation for the 2018 US Open. To accommodate the changes in grass lines on the course, nearly 300 sprinklers were relocated to ensure optimal and universal coverage are achieved in the appropriate areas. Leibold Irrigation installed the current system in 2006.
- Leibold construction and irrigation crews partnered to construct a brand new practice facility at
Camargo Club in Indian Hill, Ohio. The project consisted of a total overhaul to the driving range, which was slightly reconfigured to make room for a new all seasons indoor teaching and practice center. A new putting green was incorporated into a rebuilt and enlarged range tee, which is accompanied by three new target greens. To accommodate for the range tee expansion, a short game area was reconstructed adjacent to the driving range. The renovation took just over 1 month to complete.
August / 2017
Leibold crews were busy completing numerous projects in the month of August.
- Glen Eagle Golf & Country Club in Naples, Florida, saw it's full course renovation completed. Leibold Irrigation installed a new 18 hole Toro irrigation system, comprised of just over 900 sprinklers on HDPE pipe, and controlled via Toro's 2-wire decoder system.
- Quail West Golf & Country Club in Naples, Florida, saw the renovation of it's Lakes Course draw to a close. The Toro system designed by A. S. Altum and Associates is comprised of just over 3300 sprinklers on HDPE pipe, and took just over 6 months to complete.
- Cypress Lake Country Club in Fort Myers, Florida, finished a full course renovation project. Leibold Irrigation installed a new 18 hole Toro irrigation system comprised of over 1,100 sprinklers on HDPE pipe. The A. S. Altum design system took just over 4 months to complete.
- Eastwood Golf Course in Fort Myers, Florida, witnessed a partial renovation to it's 18 hole course finish. The front nine was reconstructed to make way for a new highway that passes through the course. A. S. Altum and Associates supplied the Toro irrigation system design comprised of just over 400 sprinklers.
- Crews from Leibold's construction and irrigation divisions finished a full course renovation project at Heritage Oaks Golf & Country Club in Sarasota, Florida. The project brought about renovations to nearly all the greens, tees, bunkers, and fairways, along with irrigation improvements around the greens and other areas as needed. The project took 6 months to complete.
- Highland Springs Golf Course in Rock Island, Illinois, completed a renovation to their driving range facility in partnership with The First Tee program. Leibold Irrigation designed and installed the new irrigation to accommodate the expanded practice area. The irrigation installation took 1 week to complete.
July / 2017
Leibold crews completed two major projects in Florida.
- TPC Prestancia in Sarasota, Florida, saw it's Club Course renovation project draw to a close. Crews from Leibold's irrigation and construction divisions joined to complete the project in roughly 7 months time. The course remained open for play through the end of February as the irrigation crew installed the mainline piping. With the course closed and mainline installation complete, the construction crew joined the project to begin the full course makeover. As the irrigation crew finished installing the new sprinklers and lateral lines on a hole, the construction crew would begin stripping and regrassing the green, as well as reshaping, leveling, and regrassing the tee complex. The hole was then completed with a no-till regrassing of the fairway. Ragan Technical Solutions provided the irrigation system design, comprised of Toro sprinklers and HDPE pipe.
- Wyndemere Country Club in Naples, Florida, saw the third and final phase of it's renovation project conclude with the completion of the Green Course. Over the past 3 years, each of Wyndemere's 3 courses has been renovated with a new Toro irrigation system. Leibold Irrigation partnered with the golf course to provide a system design tailored to each of the 3 courses specific needs. The Toro system comprised of Toro Infinity sprinklers and HDPE pipe, is controlled via Toro's 2-wire decoder system.
June / 2017
Leibold Irrigation's construction team completed a course renovation project at Yeamans Hall Club in Hanahan, SC. During the renovation, all the putting surfaces were upgraded from the original push-up style to USGA spec greens. To compliment the new green complexes, all greenside bunkers were also restored.
April / 2017
Leibold Irrigation completed the installation of a new 18 hole irrigation system at Eagles Landing Golf Course in Ocean City, Maryland. The system is comprised of over 1,400 Toro sprinklers installed on HDPE pipe, and controlled via Toro's 2-wire decoder system. Michael Kuhn & Associates supplied the design.
October / 2016
Leibold crews completed 3 major irrigation projects in the month of October:
- Installation of a new 18 hole irrigation system at Lakewood National in Bradenton, Florida was completed. The newly constructed golf course utilizes a Toro 2-wire decoder system to control over 1,800 Toro sprinklers. The A. S. Altum and Associates designed system took just over 7 months to complete.
- Quail West Golf & Country Club in Naples, Florida, saw it's Preserve Course renovation project draw to a close. The project included the installation of over 2,500 Toro sprinklers using HDPE pipe. The A.S. Altum and Associates design took just over 6 months to complete.
- Installation of a new 18 hole irrigation system was completed at the Royal Golf Club in Lake Elmo, Minnesota. Formerly known as Tartan Park, the newly renovated course designed by the late Arnold Palmer and Annika Sorenstam will retrieve 90% of it's irrigation water from storage ponds filled by storm runoff from Lake Elmo. The E.C. Designs Toro system comprised of just under 800 sprinklers is operated via Toro VP satellites and Lynx software.
September / 2016
Crews from both Leibold's irrigation and construction divisions finished projects in the month of September:
- The Vaquero Club in Westlake, Texas underwent a renovation to their practice facilities. Crews from our construction and irrigation divisions teamed up to renovate the nearly 15 acre facility. Michael Kuhn & Associates supplied the irrigation design using Toro sprinklers.
- Irrigation improvements at Meadowbrook Country Club in Northville, Michigan were completed. The Michael Kuhn & Associates design was part of a partial course renovation project comprised of the replacement or installation of over 1,300 Toro sprinklers. The system installation was part of a 10 month project, which was interrupted during the winter months.
August / 2016
The month of August brought about the completion of 2 irrigation projects:
- Installation of new a 18 hole irrigation system at St. Andrews Country Club in Boca Raton, Florida was completed. The Ragan Technical Solutions designed system was part of a total course renovation project, with the irrigation installation taking roughly 4 months to complete. The Rainbird system is comprised of over 1,400 sprinklers and operates via Rainbird's IC 2-wire control system.
- Course renovations at Shoal Creek Golf Club in Shoal Creek, Alabama, were completed in August. Leibold Irrigation was called upon to reinstall sections of the irrigation system affected by the partial course renovation, which included the majority of the greens, numerous bunkers, and an expansion to the practice facility. Leibold Irrigation installed the current system in 2010, and we'd like to thank the members and staff at Shoal Creek for their continued trust in our services.
July / 2016
Crews from Leibold Irrigation completed 2 major projects in the month of July:
- The installation of a new 18 hole irrigation system was completed at Yeamans Hall Club in Hanahan, South Carolina. The Aqua Agronomics Solutions, Inc designed system totaled just under 1,200 Toro sprinklers installed on HDPE pipe. The project took 6 months to complete.
- Installation of a new 18 hole irrigation system was finished at the Mililani Golf Club in Mililani, Hawaii. Designed by Bryant Taylor Gordon Golf, the system totaled over 1,700 Toro sprinklers installed on PVC pipe, and operated via Toro VP satellites and Lynx software. The project took 6 months to complete.
June / 2016
Crews from Leibold Irrigation completed 2 major projects in the month of June:
- The second phase of a 36 hole bunker renovation at the Mediterra Golf Club in Naples, Florida, was completed by the Leibold Irrigation Construction Division. The project included the reshaping of nearly 140 bunkers total between the North and South Courses, and the installation of a Billy Bunker Method drainage system. The crew also installed an irrigation mist zone around each bunker to supplement the irrigation system installed in 2014-2015, by Leibold Irrigation.
- Work on a new 18 hole irrigation system was completed at Pelican Marsh Golf Club in Naples, Florida. Leibold Irrigation partnered with Wesco Turf to design the new system comprised of over 1,400 Toro sprinklers installed on HDPE pipe. The project took just under 6 months to complete.
May / 2016
Teams from Leibold Irrigation finish 3 major projects in the month of May:
- Work on the new, 36 hole irrigation system at Ohio State University in Columbus, Ohio, was completed. The project took roughly ten months to complete after a two month hiatus due to the winter weather. The Michael Kuhn & Associates designed system totaled over 2,600 Toro sprinklers, installed using HDPE pipe and controlled via Toro's 2 wire decoder system.
- Work on the new, 18 hole irrigation system at South Bend Country Club in South Bend, Indiana, was completed. The A.S. Altum & Associates design totaled 1,000 Toro sprinklers installed on HDPE pipe. The project took six months to complete after a one month hiatus due to the winter weather.
- Installation of a new, 18 hole irrigation system at Pine Hills Country Club in Sheboygan, Wisconsin, was completed. The T.J. Emmerich and Associates design totaled over 900 Toro sprinklers installed on a combination of both HDPE and PVC pipe.
February / 2016
Leibold Irrigation partnered with Dale & Ramsey Golf Course Architecture to complete the construction of a new golf hole and short game area at Mililani Golf Club in Mililani, Hawaii. The project required the clearing and regrading of nearly 134,000 square feet of property to construct the new golf hole. The project took just over one month to complete. Visit the construction project gallery for pictures of the work.